Time / Date: 5/5/2023 12:39:41
JSP ID: 1002
Scope of Work: investigate load of unknown circuit 235A-23
Work Order: W0324350
Building:
Person in Charge: greg neidiger
Lead / Supervisor: Secheck, Stephen
Logged Email: gcn@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Standby Person
Second Person Identified: S. Sechak
List Other Participants: Nick Gripe
Affected Persons Notified: N/A
Switching: Non-Hazardous Switching
Panel / Equipment ID: 235A-23
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

1) check for wire on breaker 2) visually inspect panel to identify wire and associated conduit, if any, for tracing 3) perform switching to verify load on circuit

Control of Work Area

Minimum Approach Boundary:
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: No
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 3.82 cal/cm2
Arc Flash Boundary: 37
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: In office adjacent to Rm 109
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: In high bay
Fire Extinguisher Location: high bay
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

no error precursors were identified for this task

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Multimeter and other electrical test instruments

Notes / Other

Visual inspection of 120/208 panelboard with hinged cover. Potential inspection of junction boxes of branch circuits. No wire manipulation will performed. Hands will not enter RAB. Switching may be performed to verify loads if any are identified.

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov