Time / Date: 5/5/2023 12:39:41
|
JSP ID: 1002
|
Scope of Work: investigate load of unknown circuit 235A-23
|
|
Work Order: W0324350
|
Building:
|
Person in Charge: greg neidiger
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: gcn@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: S. Sechak
|
|
List Other Participants: Nick Gripe
|
|
Affected Persons Notified: N/A
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 235A-23
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1) check for wire on breaker 2) visually inspect panel to identify wire and associated conduit, if any, for tracing 3) perform switching to verify load on circuit |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 3.82 cal/cm2
|
Arc Flash Boundary: 37
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: In office adjacent to Rm 109
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: In high bay
|
Fire Extinguisher Location: high bay
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
no error precursors were identified for this task |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
Visual inspection of 120/208 panelboard with hinged cover. Potential inspection of junction boxes of branch circuits. No wire manipulation will performed. Hands will not enter RAB. Switching may be performed to verify loads if any are identified.
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |