Time / Date: 5/9/2023 9:36:00
|
JSP ID: 1010
|
Scope of Work: Seal leaks on container roof and use roofing material over patches
|
|
Work Order:
|
Building:
|
Person in Charge: William
|
Lead / Supervisor: Other
|
Logged Email: wemacklin@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: S64c
|
System Information Review:
|
|
Control of Hazardous Energy: Exclusive Control of Plug
|
|
Equipment Condition: All doors and covers closed and fully latched
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Use platform ladder to apply since flex over holes when dry roll roofing material over patches with extenchion pole from platform ladder |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: No Shock Hazard Present
|
Limited Approach Boundary: None
|
Restricted Approach Boundary: None
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: None cal/cm2
|
Arc Flash Boundary: N/A
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): None
|
Discharge wait time (minutes): None
|
Emergency Response Plan
Nearest Landline Location:
|
Emergency Number to Call:
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location:
|
Fire Extinguisher Location:
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |