Time / Date: 5/11/2023 9:46:14
|
JSP ID: 1018
|
Scope of Work: Verify circuit and panel number of receptacle underneath FPU-72 and LANStar
|
|
Work Order: W0325592
|
Building:
|
Person in Charge: Greg Neidiger
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: gcn@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: Greg Neidiger
|
|
List Other Participants: Armand Uribe (performing switching)
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 39A1A-4
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1) Check for presence of voltage at outlet 2) If outlet has voltage, perform switching of suspected circuit 39A1A-4 3)Verify absence of voltage at receptacle |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: No Shock Hazard Present
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 8.69 cal/cm2
|
Arc Flash Boundary: 62
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2+
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location:
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: East corridor
|
Fire Extinguisher Location: End of corridor
|
Contact release method available and tested: No shock hazard present
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Had discussion of potential precursors. None were identified for this task |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |