Time / Date: 5/12/2023 8:31:30
|
JSP ID: 1025
|
|
Scope of Work: Preventive maintenance
|
|
|
Work Order: W0319557
|
Building:
|
|
Person in Charge: Michael capeto
|
Lead / Supervisor: Delgado, Alex
|
|
Logged Email: juanjuarez37@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Safety Watch
|
|
|
Second Person Identified: Juan juarez
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 39A6A/72ADR002
|
|
System Information Review: Arc Flash Labels
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
After safety briefing, and LOTO we will check electrical components and connections ,clean condenser coil and check for any oil or indications of frion leakage |
Control of Work Area
|
Minimum Approach Boundary: 44
|
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
|
System Voltage: 120 Vac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: Yes
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 5.04 cal/cm2
|
|
Arc Flash Boundary: 44
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: 2+
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage:
|
|
Capacitor total stored energy (joules):
|
|
Discharge wait time (minutes):
|
Emergency Response Plan
|
Nearest Landline Location: Inside building 72
|
|
Emergency Number to Call: 7911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: Portable
|
|
Fire Extinguisher Location: Inside building 72
|
|
Contact release method available and tested: Rescue hook, Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
Insufficient/cramped/awkward space |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
Uneven surface/ watch my step when |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |