Time / Date: 5/18/2023 9:16:00
|
JSP ID: 1053
|
Scope of Work: Switching Support
Simple LOTO
|
|
Work Order: W0325253
|
Building:
|
Person in Charge: Joseph Pica
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: josephpica@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Avery Turner
|
|
List Other Participants: Vendor
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 91-Chiller Local Disconnect
|
System Information Review: Panel Schedules, Arc Flash Labels, Equipment Labeling
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Receive Permission Classify NonHazardous PPE Switch LOTO Lock Verify DeEnergized Status Vendor Performed Maintenance Confirm Completion Return to Service |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .32cal cal/cm2
|
Arc Flash Boundary: 42”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: No Cap
|
Capacitor total stored energy (joules): No Cap
|
Discharge wait time (minutes): No Cap
|
Emergency Response Plan
Nearest Landline Location: Hallway at Entrance
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Crew Carry
|
Fire Extinguisher Location: Mechanical Room
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Maintain Communication |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles |
Notes / Other
none
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |