Time / Date: 5/23/2023 7:15:16
|
JSP ID: 1076
|
Scope of Work: Reconfigure panel 585A6A
|
|
Work Order: 318232
|
Building:
|
Person in Charge: E Combs/ J Keusch
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: ccryken@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: David davis
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 585A Bld 15 first floor
|
System Information Review: Panel Schedules
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
LOTO, ZVV at panel 585A6A, remove unneeded breakers and conductors, pull in new conductors, install new breakers, make up panel, megger conductors with inspector, torque modified hardware in panel, receive approval from AHJ, close panel, bel check work area for missed items, inquire about readiness of re energization, re energize, check voltage, provide feedback |
Control of Work Area
Minimum Approach Boundary: 120 inches
|
Barricade Tape / Attendant: Danger - Red, Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 100 inches
|
Restricted Approach Boundary: 3 feet, 6 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 26.2 cal/cm2
|
Arc Flash Boundary: 99 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Outside main E room 1st floor bld 15
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Bld15 lobby
|
Fire Extinguisher Location: Bld 15 lobby
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Work interruptions due to heavy traffic typically in area work is to be done |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |