Time / Date: 5/23/2023 7:37:01
|
JSP ID: 1078
|
Scope of Work: Investigate Inop 85 AHU 06 & Controller
|
|
Work Order: W0327353
|
Building:
|
Person in Charge: J. Colmenares
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: josephpica@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Joseph Pica
|
|
List Other Participants: NONE
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: MCC-M357A1A7A1A-(CB)A6 85AHU06
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Request Permission PPE, Switch, LOTO, ZVV Investigate, possible Mode2 Work |
Control of Work Area
Minimum Approach Boundary: 78
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 13cal cal/cm2
|
Arc Flash Boundary: 78”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: No Cap
|
Capacitor total stored energy (joules): No Cap
|
Discharge wait time (minutes): No Cap
|
Emergency Response Plan
Nearest Landline Location: Adjacent Corridor
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Crew Carry - On Site
|
Fire Extinguisher Location: Adjacent Corridor
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Constant Communication Verbatim Repeat Back Re- brief as Necessary |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
NOTE: Haz Energy Controls Options: No Multiple Selections Allowed -
We Are Starting Under Simple LOTO & IAW Job Scope will likely go Mode2 to troubleshoot
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |