Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 5/26/2023 9:40:01
JSP ID: 1105
Scope of Work: Switching Support for PMT PM

General Information

Work Order
W0324228
Building
B026
Person in Charge
J.Colmenares
Lead / Supervisor
Cameron, Benjamin
Logged Email
josephpica@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
QEW Level
QEW 2
Second Person Requirement
Standby Person
Second Person Identified
Pica
Other Participants
for PMTs
Affected Persons Notified
Yes

System / Equipment

Switching
Hazardous Switching
Panel / Equipment ID
E43A5A-10 AHU-2-26
System Information Review
☑ Panel Schedules
☑ Arc Flash Labels
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
Permission Brief Switch LOTO CONFIRM Return to Service

Control of Work Area

Minimum Approach Boundary
52”
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
Avoid Contact
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
8.12cal cal/cm2
Arc Flash Boundary
52”
Working Distance
18 inches
Arc Flash PPE Level
4
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
No Cap
Capacitor Total Stored Energy (Joules)
No Cap
Discharge Wait Time (Minutes)
No Cap

Emergency Response Plan

Nearest Landline Location
Adjacent Office
Emergency Number to Call
x(7)911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Corridor
Fire Extinguisher Location
Corridor
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
None

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
Brief Maintain Communication

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles

Notes / Other

none

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan