Time / Date: 6/2/2023 12:41:50
|
JSP ID: 1129
|
Scope of Work: LOTO out equipment E208 to put in electrically safe work condition. Isolation will be at disc 16A
|
|
Work Order: Training
|
Building: 75A
|
Person in Charge: Jeff jendrick
|
Lead / Supervisor: Lee, Michael
|
Logged Email: jlhendrick@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Mike Rose
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: ET208
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Notify affected user, set up barricade and signage, open disconnect Disc16A and apply personal LOTO lock. ZVV load side of disconnect Disc 16A |
Control of Work Area
Minimum Approach Boundary: 46”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.6 cal/cm squared at 18” cal/cm2
|
Arc Flash Boundary: 46”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: No land line
|
Emergency Number to Call: 510-468-7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On wall inside training room in 75A
|
Fire Extinguisher Location: Back door entrance to room
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting |
Error Precursors
Task Demands: Time pressure (in a hurry), Repetitive actions or monotony, Critical steps or irreversible acts
|
Work Environment:
|
Individual Capabilities:
|
Human Nature: Stress (limits attention), Complacency/overconfidence
|
Error Precursor Mitigations:
Stop work as needed and pause |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |