Time / Date: 6/23/2023 7:57:50
|
JSP ID: 1174
|
Scope of Work: Opening panel 319A, panel 319A40A, Jbox with primary and secondary conductors and associated wireways for investigating and taking pictures.
|
|
Work Order: 327164
|
Building: 6
|
Person in Charge: Dave Davis
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: RobertRalph@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Robert Ralph
|
|
List Other Participants:
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: 319A and 319A40A
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Fill out JSP 2.) set up barriers for work area 3.)check gloves and arc suit 4.)Suit up 5.)Begin opening j box, panels and wireways one at a time for pictures. 6.)close all equipment and remove barricades. |
Control of Work Area
Minimum Approach Boundary: 10’4”
|
Barricade Tape / Attendant: Caution - Yellow, Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 28.3 cal/cm2
|
Arc Flash Boundary: 10’4”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Door 6 storage ring pit
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: B6 lobby
|
Fire Extinguisher Location: In the storage pit 20’ away
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Simultaneous or multiple tasks, Critical steps or irreversible acts
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Make sure everyone is on the same page during job briefing. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: