Time / Date: 6/29/2023 10:32:55
|
JSP ID: 1191
|
Scope of Work: Disconnect temporary generator for LP-4943
|
|
Work Order: W0326110
|
Building: 85
|
Person in Charge: Alma Armenta
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: alarmentaduran@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: Andrew Southward
|
|
List Other Participants: GOEBEL
|
|
Affected Persons Notified: N/A
|
Switching: Hazardous Switching
|
Panel / Equipment ID: E359A Ct2
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Remove group loto locks at isolation points to be disconnected. Establish FLP-159 on temp generator. Disconnect DLO cables/remote start/extension cords. Replace neutral ground bonding jumper as was originally found. Return house generator to original condition-both remote start circuit and power cables. Test house generator in working condition. |
Control of Work Area
Minimum Approach Boundary: 113”
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 25 cal/cm2 cal/cm2
|
Arc Flash Boundary: 113”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Building 85
|
Emergency Number to Call: 5104867911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On hand
|
Fire Extinguisher Location: By temporary generator
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet |
Notes / Other
None
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |