Time / Date: 6/29/2023 10:32:55
JSP ID: 1191
Scope of Work: Disconnect temporary generator for LP-4943
Work Order: W0326110
Building: 85
Person in Charge: Alma Armenta
Lead / Supervisor: Cameron, Benjamin
Logged Email: alarmentaduran@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition
Second Person Requirement: Not Required
Second Person Identified: Andrew Southward
List Other Participants: GOEBEL
Affected Persons Notified: N/A
Switching: Hazardous Switching
Panel / Equipment ID: E359A Ct2
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Remove group loto locks at isolation points to be disconnected. Establish FLP-159 on temp generator. Disconnect DLO cables/remote start/extension cords. Replace neutral ground bonding jumper as was originally found. Return house generator to original condition-both remote start circuit and power cables. Test house generator in working condition.

Control of Work Area

Minimum Approach Boundary: 113”
Barricade Tape / Attendant: Danger - Red

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: Not Required
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 25 cal/cm2 cal/cm2
Arc Flash Boundary: 113”
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: Not Required

Capacitor Hazards

Capacitor Bus Voltage: N/A
Capacitor total stored energy (joules): N/A
Discharge wait time (minutes): N/A

Emergency Response Plan

Nearest Landline Location: Building 85
Emergency Number to Call: 5104867911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On hand
Fire Extinguisher Location: By temporary generator
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1