Time / Date: 10/21/2022 9:53:23
|
JSP ID: 127
|
Scope of Work: Create slack in CT wiring in panels 693A1A and 693A3A to make terminations at Trendpoint cabinets
|
|
Work Order: NA
|
Building:
|
Person in Charge: Ernie Jew
|
Lead / Supervisor: Other
|
Logged Email: ejew@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Jeff Grounds
|
|
List Other Participants: Eric Lucas as attendant so nobody crosses LOTO work zone
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Sub 693A, 693A1A, 693A3A
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Set up orange Warning tape and signage Perform job briefing Notify Operations of power shut down Open disconnects at Perlmutter computer cabinets and CDU Open breakers at Substation 693A for panels 693A1A and 693A3A Wear proper PPE and open panel covers at 693A1A and 693A3A Perform ZVV at panels 693A1A and 693A3A Create slack in CT wiring to reach terminations in Trendpoint cabinets Close up panel covers at 693A1A and 693A3A Notify Operations that power will be restored Close breakers at Substation 693A Close disconnects at Perlmutter computer cabinets and CDU Remove orange Warning tape and signage Review job performance with Group |
Control of Work Area
Minimum Approach Boundary: 42"
|
Barricade Tape / Attendant: Warning
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 2.7 cal/cm2
|
Arc Flash Boundary: 40"
|
Working Distance: 24 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): NA
|
Emergency Response Plan
Nearest Landline Location: Control Room
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 3rd floor near Men's restroom
|
Fire Extinguisher Location: Next to panel 693A3A
|
Contact release method available and tested: Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
NA |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |