Time / Date: 10/21/2022 15:29:45
|
JSP ID: 129
|
Scope of Work: Put Final Power Amplifier under electrically safe conditions to troubleshoot. Switch breakers and verify capacitor voltage after 7 minutes.
|
|
Work Order:
|
Building:
|
Person in Charge: Taimoor Hassan
|
Lead / Supervisor: Other
|
Logged Email: hassan@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Ken Lambert
|
|
List Other Participants:
|
|
Affected Persons Notified:
|
Switching: Hazardous Switching
|
Panel / Equipment ID: A3120-CB3
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Inform Control room and start applying LOTO to all CB as per R5G-1 procedure. |
Control of Work Area
Minimum Approach Boundary: 65
|
Barricade Tape / Attendant: Caution
|
Shock Risk Assessment
System Voltage: 120/240 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 9.25 cal/cm2
|
Arc Flash Boundary: 65
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage: 15.6
|
Capacitor total stored energy (joules): 409J
|
Discharge wait time (minutes): 7
|
Emergency Response Plan
Nearest Landline Location: outside Vault gate
|
Emergency Number to Call: 5104866999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 88 entrance
|
Fire Extinguisher Location: high bay
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
none |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |