Time / Date: 10/24/2022 8:15:33
JSP ID: 133
Scope of Work: Change Switch in 69-213A
Work Order: 298432
Building:
Person in Charge: Christopher Nelson
Lead / Supervisor: Secheck, Stephen
Logged Email: cnelson@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Alex lopez
List Other Participants: Alex lopez
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 217A1A2A
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

JSP Switch LOTO ZVV replace switch release LOTO switch test switch for normal operation

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Caution

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 3.31 cal/cm2 cal/cm2
Arc Flash Boundary: 34 inches
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: NA
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): NA

Emergency Response Plan

Nearest Landline Location: Room 125
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 50ft from panel
Fire Extinguisher Location: Same location as AED
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment: Distractions/interruptions
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Be aware of Our surroundings

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov