Time / Date: 10/24/2022 8:39:56
|
JSP ID: 134
|
Scope of Work: Pm for 74-AC-025
|
|
Work Order: 299102
|
Building:
|
Person in Charge: Gerald Fowler
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: gdfowler@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Antonio Collado
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: E47A2A2A22A/74-AC-025
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Loto out unit perform pm |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Notice
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .008 cal cm2 cal/cm2
|
Arc Flash Boundary: 3 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: Building lobby/ conference room
|
Emergency Number to Call: 6999/7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Building lobby
|
Fire Extinguisher Location: On roof
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Repetitive actions or monotony
|
Work Environment:
|
Individual Capabilities:
|
Human Nature: Assumptions, Complacency/overconfidence
|
Error Precursor Mitigations:
Na |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: