Time / Date: 10/25/2022 9:39:11
|
JSP ID: 142
|
Scope of Work: Replace Ckt brkr #4 in 208v panel
|
|
Work Order:
|
Building:
|
Person in Charge: Jeff Grounds
|
Lead / Supervisor: Other
|
Logged Email: jtgrounds@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Mike Rose
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Panel 2
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Notify affected people of shutdown Set up safety parameters Assign safety watch Perform job safety briefing Open 480v disconnect Apply LOTO to 480v disconnect Perform ZVV at 480v disconnect Open 208v panel Perform ZVV at 208v panel Replace Ckt brkr #4 Close 208v panel Notify affected people that equipment to be Re energized Remove LOTO from 480v disconnect Close disconnect and Re energize circuit Remove safety parameters Collect feedback Task complete |
Control of Work Area
Minimum Approach Boundary: 46”
|
Barricade Tape / Attendant: Warning
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.39 cal cal/cm2
|
Arc Flash Boundary: 46”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Cellphone
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Wall
|
Fire Extinguisher Location: Outside roll up door
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |