Time / Date: 10/26/2022 10:56:19
JSP ID: 150
Scope of Work: PM
Work Order: W0299088
Building:
Person in Charge: Capeto
Lead / Supervisor: Delgado, Alex
Logged Email: mcapeto@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Geraldo
List Other Participants: None
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 76 AC 010
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition:

Sequence of Job Steps

List basic sequence of steps from start to finish.

PM- verify ops and temps. Switching and LOTO. ZZV. General inspection of electrical and tightening. Check motor bearings, fan blades, wheels, indoor and outdoor coils. Remove LOTO, switching, return to service

Control of Work Area

Minimum Approach Boundary: 16”
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/240 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: Avoid contact
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 0.99 cal cal/cm2
Arc Flash Boundary: 16”
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: NA
Capacitor total stored energy (joules): NA
Discharge wait time (minutes): NA

Emergency Response Plan

Nearest Landline Location: Room 212
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 2n floor @ vending machines
Fire Extinguisher Location: Room 212
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Reviewed

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov