Time / Date: 9/11/2023 10:35:15
JSP ID: 1524
Scope of Work: Remove damaged power disconnect at exterior wall of building 71C.
Work Order: 319402
Building: 71C
Person in Charge: Alejandro Lopez
Lead / Supervisor: Secheck, Stephen
Logged Email: alopez2@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Greg Neidiger
List Other Participants: None
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 172A12A
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed

Sequence of Job Steps

List basic sequence of steps from start to finish.

LOTO, ZVV and remove power disconnect from exterior wall of building 71C.

Control of Work Area

Minimum Approach Boundary: 12inches
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: .12 cals cal/cm2
Arc Flash Boundary: 55 inches
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage: N/A
Capacitor total stored energy (joules): N/A
Discharge wait time (minutes): N/A

Emergency Response Plan

Nearest Landline Location: Inside building 71C
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Building 71J
Fire Extinguisher Location: Building 71J
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Multimeter and other electrical test instruments

Notes / Other

None at this time.

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov