Time / Date: 9/24/2023 4:10:13
|
JSP ID: 1586
|
Scope of Work: Investigate the cause of the loss of Bank 303 'B' phase to Booster Bend, Booster QD & QF, by switching off the mainline power to the Booster Bend which currently has a Blown Fuse on Secondary Xfmr fault. Possible short in 'B' Phase of the Booster Bend input XFMR
|
|
Work Order:
|
Building: 6
|
Person in Charge: Erik Kawakami
|
Lead / Supervisor: Bashaw, Doug
|
Logged Email: nigel.mesta@lbl.gov
|
Division: ALS
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Nigel Mesta
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 303A2A1A-Main Disconnect, 323A-CB23, 303A1A-CB4
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Ensure power supply is off 2. Open the disconnect for the Booster Bend. 3. Check to see if the 'B' phase is returns for Booster QD & QF. 4. If so LOTO out the Booster Bend. 5. Perform ZVV on Booster Bend 6. Check to see if 'B' phase is shorted across the XFMR 7. If phase 'B' does not return to Booster QD & QF contact facilities to request assistance in determining the loss of 'B' phase of Bank 303. |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class:
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 10 cal/cm2
|
Arc Flash Boundary: 67
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures:
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: x5457
|
Emergency Number to Call: x4969
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Building 80
|
Fire Extinguisher Location: Building 6
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None identified. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: