Time / Date: 9/26/2023 11:10:39
JSP ID: 1598
Scope of Work: Loto ZVV
Work Order: N/A
Building: 75
Person in Charge: Derek McCabe
Lead / Supervisor: Other
Logged Email: Dmccabe@lbl.gov
Division: Other
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Cliff Woo
List Other Participants: Ari Harding
Affected Persons Notified: Yes
Switching: No Switching Required
Panel / Equipment ID: Disc 16A
System Information Review: Arc Flash Labels, Visual inspection
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

1.Join RI loto LP12334 (example) 2.Open disc 16A 3.ZVV disc 16A 4.Perform repairs 5.Close disc 16A 6.End

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 2.37 cal/cm2
Arc Flash Boundary: 26"
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: 75 hallway
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 75A south wall
Fire Extinguisher Location: Outside west door
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands: High workload (memory requirements)
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

JSP

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Practice/test

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan