QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 9/26/2023 11:12:21
JSP ID: 1599
Scope of Work: ZVV at disc 16A 480vac

General Information

Work Order
1234
Building
75A
Person in Charge
CWoo
Lead / Supervisor
Other
Logged Email
konecliff@gmail.com
Division
Facilities

Work Planning

Modes of Work
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Standby Person
Second Person Identified
Derek Mccabe
Other Participants
Ari Harding - LBNL EHS
Affected Persons Notified
Yes

System / Equipment

Switching
No Switching Required
Panel / Equipment ID
16A
System Information Review
☑ Arc Flash Labels
Control of Hazardous Energy
Complex LOTO w/ RI
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
1. Join RI LOTO. 2. Open 16A panel=our elev control. 3. ZVV 16A Load side. 4. Do repairs. 5. Close 16A panel = our elev control. 6. Remove my lock from RI group lock.

Control of Work Area

Minimum Approach Boundary
Greater the LAB or is 42” vs arc flash 26”
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
277/480 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
Yes
Voltage Glove Class
00
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
2.37 cal/cm2
Arc Flash Boundary
26
Working Distance
18 inches
Arc Flash PPE Level
2
Incident Energy Reduction Measures
00

Capacitor Hazards

Capacitor Bus Voltage
NA
Capacitor Total Stored Energy (Joules)
NA
Discharge Wait Time (Minutes)
NA

Emergency Response Plan

Nearest Landline Location
B75 in hallway
Emergency Number to Call
7911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
On wall right hand south
Fire Extinguisher Location
Outside west door and is charged
Contact Release Method Available and Tested
Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?
None

Error Precursors

Task Demands
Time pressure (in a hurry), High workload (memory requirements)
Work Environment
Distractions/interruptions
Individual Capabilities
Unfamiliar with, or first time performing task, New technique not used before
Human Nature
Stress (limits attention)
Error Precursor Mitigations
Step by step procedure JSP Job Safety Plan

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Practical test for QEW 2 level

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan