Time / Date: 10/31/2022 6:43:15
JSP ID: 163
Scope of Work: Replace two missing panel cover screws (panel 659A15A 90X-105B)
Work Order: W0300445
Building:
Person in Charge: Greg Neidiger
Lead / Supervisor: Secheck, Stephen
Logged Email: gcn@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition
Second Person Requirement: Not Required
Second Person Identified:
List Other Participants:
Affected Persons Notified: N/A
Switching: No Switching Required
Panel / Equipment ID: 659A15A
System Information Review: N/A
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

1)Find spare screws in shop stock 2)Install new screws

Control of Work Area

Minimum Approach Boundary:
Barricade Tape / Attendant:

Shock Risk Assessment

System Voltage: No Shock Hazard Present
Limited Approach Boundary: no shock hazard
Restricted Approach Boundary: n/a
Will the hands enter the RAB: No
Voltage Glove Class: Not Required
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: N/A cal/cm2
Arc Flash Boundary: N/A
Working Distance: no arc flash hazard
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: Not Required

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location:
Emergency Number to Call:
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: B90 lobby
Fire Extinguisher Location:
Contact release method available and tested:

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

N/A

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov