Time / Date: 10/31/2022 11:22:54
JSP ID: 168
Scope of Work: Replace bucket for BL-4 in Bld 70
Work Order: W0299325
Building:
Person in Charge: Andrew Southward
Lead / Supervisor: Cameron, Benjamin
Logged Email: amsouthward@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Safety Watch
Second Person Identified: Ben Cameron
List Other Participants: Avery Turner
Affected Persons Notified: N/A
Switching: No Switching Required
Panel / Equipment ID: Em30A5A3A
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Lower instantaneous value at breaker 30A, pull bucket, replace with new bucket, restore instantaneous values at 30A, run bl-4 and verify proper operation

Control of Work Area

Minimum Approach Boundary: 42 inches
Barricade Tape / Attendant: Danger - Red

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: Yes

Arc Flash Risk Assessment

Incident Energy: 1.1 Cals after taking instantaneous setting to 2.2 cal/cm2
Arc Flash Boundary: Less than 42
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: Bld 70
Emergency Number to Call: 90
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On hand
Fire Extinguisher Location: In mcc
Contact release method available and tested: Upstream breaker or switch, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Lookalike equipment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov