					Time / Date: 10/31/2022 14:02:05				 				
				 | 
				
				 
					JSP ID: 169				 
				 | 
				
| 
				 
					Scope of Work: Install 3 pole breaker blank in panel 249A B2-412				 				
				 | 
				|
| 
				 
					Work Order: W0300501				 				
				 | 
				
				 
					Building: 				 				
				 | 							
				
| 
				 
					Person in Charge: Greg Neidiger				 				
				 | 
				
				 
					Lead / Supervisor: Secheck, Stephen				 
				 | 
				
| 
				 
					Logged Email: gcn@lbl.gov				 				
				 | 
				
				 
					Division: Facilities				 				
				 | 
				
| 
				 
					QEW Level: QEW 2				 				
				 | 
				
				 | 
				
| 
				 
					Modes of Work: Mode 0 - Electrically Safe Work Condition				 				
				 | 
				|
| 
				 
					Second Person Requirement: Not Required				 				
				 | 
				|
| 
				 
					Second Person Identified: 				 				
				 | 
				|
| 
				 
					List Other Participants: 				 				
				 | 
				|
| 
				 
					Affected Persons Notified: N/A				 				
				 | 
				|
| 
				 
					Switching: No Switching Required				 				
				 | 
				
				 
					Panel / Equipment ID: 249A				 
				 | 
				
| 
				 
					System Information Review: Arc Flash Labels				 				
				 | 
				|
| 
				 
					Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)				 				
				 | 
				|
| 
				 
					Equipment Condition: 				 				
				 | 
				|
Sequence of Job Steps
| 
				 
					List basic sequence of steps from start to finish. 				
				Get part number for purchasing material  | 
				
Control of Work Area
| 
				 
					Minimum Approach Boundary: 				 				
				 | 
				
| 
				 
					Barricade Tape / Attendant: 				 
				 | 
				
Shock Risk Assessment
| 
				 
					System Voltage: No Shock Hazard Present				 				
				 | 
				
| 
				 
					Limited Approach Boundary: n/a				 				
				 | 
				
| 
				 
					Restricted Approach Boundary: n/a				 				
				 | 
				
| 
				 
					Will the hands enter the RAB: No				 				
				 | 
				
| 
				 
					Voltage Glove Class: Not Required				 				
				 | 
				
| 
				 
					Will any other part of the body enter the RAB: No				 				
				 | 
				
Arc Flash Risk Assessment
| 
				 
					Incident Energy: n/a cal/cm2
				 				
				 | 
				
| 
				 
					Arc Flash Boundary: n/a				 				
				 | 
				
| 
				 
					Working Distance: No Arc Flash Hazard Present				 				
				 | 
				
| 
				 
					Arc Flash PPE Level: Minimum PPE for Electrical Work				 				
				 | 
				
| 
				 
					Incident Energy Reduction Measures: Not Required				 				
				 | 
				
Capacitor Hazards
| 
				 
					Capacitor Bus Voltage: 				 				
				 | 
				
| 
				 
					Capacitor total stored energy (joules): 				 				
				 | 
				
| 
				 
					Discharge wait time (minutes): 				 				
				 | 
				
Emergency Response Plan
| 
				 
					Nearest Landline Location: 				 				
				 | 
				
| 
				 
					Emergency Number to Call: 				 				
				 | 
				
| 
				 
					Sufficient cell phone signal? 				 				
				 | 
				
| 
				 
					Clear exit path? 				 				
				 | 
				
| 
				 
					AED Location: 				 				
				 | 
				
| 
				 
					Fire Extinguisher Location: 				 				
				 | 
				
| 
				 
					Contact release method available and tested: 				 				
				 | 
				
Environmental Conditions
| 
				 
					Does the environment present additional hazards that should be addressed? 				
				None  | 
				
Error Precursors
| 
				 
					Task Demands: 				 				
				 | 
				
| 
				 
					Work Environment: 				 				
				 | 
				
| 
				 
					Individual Capabilities: 				 				
				 | 
				
| 
				 
					Human Nature: 				 				
				 | 
				
| 
				 
					Error Precursor Mitigations:  				
				n/a  | 
				
PPE Inspections
| 
				 | 
				
Notes / Other
| 
				 | 
				
Perform Job Breifing
| 
				 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  				
				A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov  | 
				