Time / Date: 11/2/2022 10:00:22
JSP ID: 172
Scope of Work: Determine wire size
Work Order: W0301099
Building:
Person in Charge: Ben Cameron
Lead / Supervisor: Cameron, Benjamin
Logged Email: bccameron@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Not Required
Second Person Identified: Not required
List Other Participants: Joseph Pica
Affected Persons Notified: N/A
Switching: No Switching Required
Panel / Equipment ID: E47A2A2A22A
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Open VFD cabinet and check wire size

Control of Work Area

Minimum Approach Boundary: 42 inches
Barricade Tape / Attendant: Danger - Red

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: .23 cal cal/cm2
Arc Flash Boundary: 7”
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Building 74
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: In truck
Fire Extinguisher Location: In the hallway
Contact release method available and tested: Upstream breaker or switch, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov