Time / Date: 10/20/2023 11:38:43
|
JSP ID: 1725
|
Scope of Work: Remove temporary power from FPU 002 in 100 Hallway. Re-terminate the Epower panel circuit to the FPU.
|
|
Work Order: 329794
|
Building: 72
|
Person in Charge: Anthony Pilz
|
Lead / Supervisor: Ramer, Robert
|
Logged Email: apilz@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Shane Miller
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 39A1A & E157A1A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
-LOTO Normal Power panel and ZVV FPU002. -Remove the Flex from the receptacle in the hallway that feeds FPU j box. -Due to air gap in jbox in ceiling able to work off simple LOTO in panel 39A1A circuit 4. -Release LOTO to 39A1A circuit 4. -Implement Simple LOTO and ZVV on Panel E157A1A circuit 12. -Re splice the Epower circuit to the FPU j box -Release LOTO |
Control of Work Area
Minimum Approach Boundary: 60 inches
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 39A1A= 8.69 cal/cm^2 ; E157A1A= <1.2 cal/cm^2 cal/cm2
|
Arc Flash Boundary: 39A1A= 62 inches ; E157A1A= 18 inches
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: In Office next to Panel
|
Emergency Number to Call: 6999 / 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: End of the Hall
|
Fire Extinguisher Location: End of Hall
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature: Stress (limits attention)
|
Error Precursor Mitigations:
Created a Clean Work environment by getting in the building early enough for no occupants to be in there. |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: