Time / Date: 10/20/2023 11:38:43
JSP ID: 1725
Scope of Work: Remove temporary power from FPU 002 in 100 Hallway. Re-terminate the Epower panel circuit to the FPU.
Work Order: 329794
Building: 72
Person in Charge: Anthony Pilz
Lead / Supervisor: Ramer, Robert
Logged Email: apilz@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Shane Miller
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 39A1A & E157A1A
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

-LOTO Normal Power panel and ZVV FPU002. -Remove the Flex from the receptacle in the hallway that feeds FPU j box. -Due to air gap in jbox in ceiling able to work off simple LOTO in panel 39A1A circuit 4. -Release LOTO to 39A1A circuit 4. -Implement Simple LOTO and ZVV on Panel E157A1A circuit 12. -Re splice the Epower circuit to the FPU j box -Release LOTO

Control of Work Area

Minimum Approach Boundary: 60 inches
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120 Vac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 39A1A= 8.69 cal/cm^2 ; E157A1A= <1.2 cal/cm^2 cal/cm2
Arc Flash Boundary: 39A1A= 62 inches ; E157A1A= 18 inches
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: In Office next to Panel
Emergency Number to Call: 6999 / 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: End of the Hall
Fire Extinguisher Location: End of Hall
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature: Stress (limits attention)
Error Precursor Mitigations:

Created a Clean Work environment by getting in the building early enough for no occupants to be in there.

PPE Inspections

Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1