Time / Date: 10/23/2023 8:24:57
JSP ID: 1732
Scope of Work: Switching support for Kone elevator testing
Work Order: W0350970
Building: 33
Person in Charge: AndrewSouthward
Lead / Supervisor: Cameron, Benjamin
Logged Email: amsouthward@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Alma Duran
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 635A1A-1
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Establish safe work zone, identify proper circuit, switch off and verify generator and load bank starts, after elevator testing is complete switch breaker back on

Control of Work Area

Minimum Approach Boundary: 62
Barricade Tape / Attendant:

Shock Risk Assessment

System Voltage: No Shock Hazard Present
Limited Approach Boundary: None
Restricted Approach Boundary: None
Will the hands enter the RAB: No
Voltage Glove Class: Not Required
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 11.4 cal/cm2
Arc Flash Boundary: 62”
Working Distance: 18 inches
Arc Flash PPE Level: 2+
Incident Energy Reduction Measures: Not Required

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: Cell phone
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On hand
Fire Extinguisher Location: Hallway outside of electrical room
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Lookalike equipment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov