Time / Date: 11/2/2022 13:21:04
|
JSP ID: 178
|
Scope of Work: Put receptacle on an unswitched hot
|
|
Work Order: W0299695
|
Building:
|
Person in Charge: Greg Neidiger
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: gcn@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 33A-16
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1) LOTO & ZVV 2) Re-wire receptacle at switch box 3) Release LOTO and test function |
Control of Work Area
Minimum Approach Boundary: n/a
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: No Shock Hazard Present
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 8.15 depending on task cal/cm2
|
Arc Flash Boundary: 52in.
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: B17
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location:
|
Fire Extinguisher Location:
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No error precursors. No mitigations. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |