Time / Date: 11/2/2022 13:21:04
JSP ID: 178
Scope of Work: Put receptacle on an unswitched hot
Work Order: W0299695
Building:
Person in Charge: Greg Neidiger
Lead / Supervisor: Secheck, Stephen
Logged Email: gcn@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Not Required
Second Person Identified:
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 33A-16
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish.

1) LOTO & ZVV 2) Re-wire receptacle at switch box 3) Release LOTO and test function

Control of Work Area

Minimum Approach Boundary: n/a
Barricade Tape / Attendant:

Shock Risk Assessment

System Voltage: No Shock Hazard Present
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: No
Voltage Glove Class: Not Required
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 8.15 depending on task cal/cm2
Arc Flash Boundary: 52in.
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: Not Required

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: B17
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location:
Fire Extinguisher Location:
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

No error precursors. No mitigations.

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov