Time / Date: 11/13/2023 9:30:55
JSP ID: 1832
Scope of Work: Annual PM B30 ARU001
Work Order: 344363
Building: B30
Person in Charge: Larry Antles
Lead / Supervisor: Delgado, Alex
Logged Email: leantles@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Justin Solis
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 650A2A/B30 ARU001
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

LOTO ZVV check and tighten electrical brush tubes leak check

Control of Work Area

Minimum Approach Boundary: 42in
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 1.8cal cal/cm2
Arc Flash Boundary: 23in
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: 700DC
Capacitor total stored energy (joules): 1600 PER COMPRESSOR
Discharge wait time (minutes): 20 MINS

Emergency Response Plan

Nearest Landline Location: B30-129
Emergency Number to Call: 6999
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: At chiller
Fire Extinguisher Location: Outside of chiller rm
Contact release method available and tested: Rescue hook

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Lookalike equipment, Noisy environment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Electrical slips trips and falls

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov