Time / Date: 11/3/2022 10:22:26
|
JSP ID: 184
|
Scope of Work: PM in equipment 208
|
|
Work Order: Michael rose training
|
Building:
|
Person in Charge: Juan garcia
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: juanjuarez37@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Michael rose Qwe2
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 234a
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition:
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Locate main ,and disconnect , switch off with loto and zvv , performed work and turn unit back to normal operation. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 2.37 cal/cm2
|
Arc Flash Boundary: 26
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Yes
|
Emergency Number to Call: 5104867911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: By the door
|
Fire Extinguisher Location: Yes
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities: New technique not used before
|
Human Nature:
|
Error Precursor Mitigations:
Boundary install ,standby person ,located panel ,switch 16 |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: