Time / Date: 11/3/2022 10:22:26
JSP ID: 184
Scope of Work: PM in equipment 208
Work Order: Michael rose training
Building:
Person in Charge: Juan garcia
Lead / Supervisor: Delgado, Alex
Logged Email: juanjuarez37@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Michael rose Qwe2
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 234a
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition:

Sequence of Job Steps

List basic sequence of steps from start to finish.

Locate main ,and disconnect , switch off with loto and zvv , performed work and turn unit back to normal operation.

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 2.37 cal/cm2
Arc Flash Boundary: 26
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Yes
Emergency Number to Call: 5104867911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: By the door
Fire Extinguisher Location: Yes
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities: New technique not used before
Human Nature:
Error Precursor Mitigations:

Boundary install ,standby person ,located panel ,switch 16

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov