Time / Date: 12/6/2023 15:29:42
|
JSP ID: 1935
|
Scope of Work: Testing and troubleshooting of dewar heater
|
|
Work Order:
|
Building: 58
|
Person in Charge: Ohmar Sowle
|
Lead / Supervisor: Other
|
Logged Email: oasowle@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: None
|
|
List Other Participants: None
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: Vendor owned helium dewar with heater
|
System Information Review: None - plug and cord
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition:
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
JSP, danger tape, measure voltage from dewar to switch and switch housing with switch in all positions, measure the current to heater in all positions, measure current with 3k resistance from dewar to switch |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: Plug and cord 120v cal/cm2
|
Arc Flash Boundary: Na
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): 0
|
Discharge wait time (minutes): 0
|
Emergency Response Plan
Nearest Landline Location: Offices at the endo of 58
|
Emergency Number to Call: 7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Offices at end of 58
|
Fire Extinguisher Location: Wall by door
|
Contact release method available and tested: Pallet nearby
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |