Time / Date: 12/8/2023 8:47:28
JSP ID: 1947
Scope of Work: Cover 120VAC terminals on deflector positioning equipment under deflector bonnet.
Work Order: None
Building: 88
Person in Charge: Scott Small
Lead / Supervisor: Other
Logged Email: smsmall@lbl.gov
Division: Other
QEW Level: QEW 1
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Not Required
Second Person Identified:
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: B088 Deflectors
System Information Review: Single Line Drawing, Arc Flash Labels
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

LOTO/ZVV, remove power supplies and bonnet, place electrical insulating blankets over terminals, replace power supplies/bonnet.

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant:

Shock Risk Assessment

System Voltage: 120 Vac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: None - 120VAC systems. cal/cm2
Arc Flash Boundary: N/A
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: 88 Control Room
Emergency Number to Call: 911
Sufficient cell phone signal? No
Clear exit path? Yes
AED Location: 88 Lobby
Fire Extinguisher Location: Inside entrance to control room.
Contact release method available and tested:

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov