Time / Date: 11/7/2022 8:54:19
|
JSP ID: 199
|
Scope of Work: Subcontractor to Rewire and test the low water cut off switch for the new boiler (66-BR-04)
LBL LOTO support
|
|
Work Order: 301457
|
Building:
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Ramer, Robert
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Alex lopez
|
|
List Other Participants: Alex lopez
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Disconnect 66-BR-004
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Review LOTO permit procedure LP-4775 briefing fill out jsp Inspect select proper pipe switch LOTO ZVV hang gold HEC lock turnover lotto to The RI contractor does work. Release LOTO and re energize test for normal operation |
Control of Work Area
Minimum Approach Boundary: 69 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 18.1 cal/cm^2 cal/cm2
|
Arc Flash Boundary: 69inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: Real room area 66
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Lobby
|
Fire Extinguisher Location: Next room
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature: Stress (limits attention)
|
Error Precursor Mitigations:
Don’t be rushed be alert don’t get complacent |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: