Time / Date: 12/21/2023 9:22:50
JSP ID: 2010
Scope of Work: Replacing pole lights
Work Order:
Building: 59
Person in Charge: Frank Hampton
Lead / Supervisor: Keusch, Justen
Logged Email: schea@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Not Required
Second Person Identified: Sayee Chea
List Other Participants: Balbino Mercadal
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: UE5A8A4A90
System Information Review: Panel Schedules
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Control of Work Area

Minimum Approach Boundary:
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 0.81 cal/cm2
Arc Flash Boundary: 15 inches
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Cell phone
Emergency Number to Call: 5104867911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Lobby
Fire Extinguisher Location: Lobby
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Noisy environment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Review scope of work

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov