Time / Date: 11/8/2022 10:19:20
|
JSP ID: 205
|
Scope of Work: Loto out unit then replace faulty compressor (s).
|
|
Work Order: 299746
|
Building:
|
Person in Charge: Gerald Fowler
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: gdfowler@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Justin Solis
|
|
List Other Participants: None
|
|
Affected Persons Notified: N/A
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Mcc5A8A /46-ARU-005
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Recover refrigerant from unit. Loto out unit. Remove and replace faulty compressor(s) then evacuate unit and charge unit. Release Loto and start up unit. |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.12 cal cm 2 cal/cm2
|
Arc Flash Boundary: 37 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: Just inside building
|
Emergency Number to Call: 510-486-6999/7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Lobby of building 64
|
Fire Extinguisher Location:
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Insufficient/cramped/awkward space |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature: Complacency/overconfidence
|
Error Precursor Mitigations:
Remain mindful of actions and consequences. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: