JSP ID: 2056
Scope of Work: Burner on boiler replacement
Work Order: W0354428
Building: B70
Person in Charge: Gerald fowler
Lead / Supervisor: Delgado, Alex
Logged Email: juanjuarez37@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Juan juarez
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: E30A5A7A31A/70BR010
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

After safety briefing we will establish loto and zvv protocols ,removed and replace burner on unit 70BR010 and tested after service

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 4.14 cal/cm2
Arc Flash Boundary: 36”
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Outside hallway
Emergency Number to Call: 699
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Main entrance b70a
Fire Extinguisher Location: Hallway
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Noisy environment

Error Precursors

Task Demands: Time pressure (in a hurry)
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Accomplish whatever we can for today

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan