Time / Date: 1/11/2024 13:02:04
JSP ID: 2070
Scope of Work: Swap out portable generator at 70A
Work Order: W0354170
Building: 70A
Person in Charge: Cameron
Lead / Supervisor: Cameron, Benjamin
Logged Email: jcolmenares@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Turner
List Other Participants: Colmenares
Affected Persons Notified: N/A
Switching: Non-Hazardous Switching
Panel / Equipment ID: None
System Information Review: Single Line Drawing
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

LOTO BY DISCONNECT battery negative terminal disconnect. Unplugged load wires to Building.. reverse actions for degenerative

Control of Work Area

Minimum Approach Boundary: Na
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: No Shock Hazard Present
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: Yes

Arc Flash Risk Assessment

Incident Energy: Unknow cal/cm2
Arc Flash Boundary: Unknown
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: None
Emergency Number to Call: 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On site
Fire Extinguisher Location: On site
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands: Time pressure (in a hurry), High workload (memory requirements), Simultaneous or multiple tasks, Repetitive actions or monotony, Critical steps or irreversible acts, Interpretation requirements, Unclear goals, roles, or responsibilities, Lack of or unclear standards
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov