Time / Date: 1/17/2024 7:15:04
|
JSP ID: 2090
|
Scope of Work: Lock out breaker for FA panel, ZVV, install CP-35, re-energize FA
|
|
Work Order: Training
|
Building: 75A
|
Person in Charge: Noel Cuffee
|
Lead / Supervisor: Gomez, Rudy
|
Logged Email: eacuffee@gmail.com
|
Division: Facilities
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: Mike Rose
|
|
List Other Participants: N/A
|
|
Affected Persons Notified: N/A
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Siemens system 3 FA panel
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Lock out breaker for FA panel, ZVV, install CP-35, re-energize FA |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Warning - Orange, Danger - Red
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.2 cal cal/cm2
|
Arc Flash Boundary: Warning tape and sign
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: B75
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Near FA panel
|
Fire Extinguisher Location: Outside the back door
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No time constraints |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |