Time / Date: 9/26/2022 7:54:27
|
JSP ID: 21
|
Scope of Work: Re set 62 car charger breaker. Plug in electric car for two hours. Then Un plug the car and plug it back in to see if the breaker trips.
|
|
Work Order: 296613
|
Building:
|
Person in Charge: Chris Nelson
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants: Greg Neidiger
|
|
Affected Persons Notified:
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 95A22A/1
|
System Information Review: Panel Schedules, Arc Flash Labels, Clipper Creek car charger manual
|
|
Control of Hazardous Energy: Exclusive Control of Plug
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
|
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: Avoid contact
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 22.4 cal/cm^2 cal/cm2
|
Arc Flash Boundary: 107 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Room 101b
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? No
|
AED Location: At main lobby b62 2nd floor
|
Fire Extinguisher Location: In this room 201 high bay
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |