Time / Date: 1/20/2024 11:23:04
|
JSP ID: 2109
|
Scope of Work: HVAC Controls to Install 120V disconnects for chilled water valves AHU's 17,18,19,20
|
|
Work Order: N/A
|
Building: 59
|
Person in Charge: Jeff Grounds
|
Lead / Supervisor: Grounds, Jeff
|
Logged Email: jtgrounds@lbl.gov
|
Division: Comp Sci
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Jeff Grounds
|
|
List Other Participants: HVAC Controls, Sunbelt Controls
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Panel 694
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Perform job and LOTO briefing with contractor NERSC QEW2 to LOTO Panel 694 at 480V disconnect ZVV at Panel 694 (120/208V panel) ZVV at PNL 694 branch circuit junction boxes at AHU's prior to starting work Re work conduit, wire and add disconnects Perform re energization briefing Remove LOTO and re energize Panel 694 at 480V disconnect Verify operation of associated equipment Perform post job briefing |
Control of Work Area
Minimum Approach Boundary: 20"
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.38 ca/cm2 cal/cm2
|
Arc Flash Boundary: 20"
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Jeff Grounds Office
|
Emergency Number to Call: X6999 0r (510) 486-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Jeff Grounds Office
|
Fire Extinguisher Location: Adjacent columns in room 1201A, UPS room
|
Contact release method available and tested: Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |