Time / Date: 1/26/2024 9:46:21
JSP ID: 2129
Scope of Work: Remove indicated out of service conductors SHB cables
Work Order: 358455
Building: 6
Person in Charge: E Combs
Lead / Supervisor: Keusch, Justen
Logged Email: ccryken@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition
Second Person Requirement: Not Required
Second Person Identified:
List Other Participants: Chris Nelson, Robert Ralph
Affected Persons Notified: N/A
Switching: No Switching Required
Panel / Equipment ID: N/A
System Information Review: Linac cables labeled at BA racks
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition:

Sequence of Job Steps

List basic sequence of steps from start to finish.

Walkjob with supervisor. Perform work

Control of Work Area

Minimum Approach Boundary:
Barricade Tape / Attendant:

Shock Risk Assessment

System Voltage: No Shock Hazard Present
Limited Approach Boundary: None
Restricted Approach Boundary: None
Will the hands enter the RAB: No
Voltage Glove Class: Not Required
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: N/A cal/cm2
Arc Flash Boundary: N/A
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: Not Required

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: All over storage ring pit
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Bldg 88 first floor
Fire Extinguisher Location: Multiple inside storage ring pit
Contact release method available and tested:

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

N/A

PPE Inspections

Safety glasses (ANSI Z87),
Non-melting footwear that fully covers the feet,
Gloves

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov