Time / Date: 3/11/2024 8:42:30
|
JSP ID: 2292
|
Scope of Work: Replace thermostat for modulator AC.
|
|
Work Order: n/a
|
Building: B88
|
Person in Charge: Ken Lambert
|
Lead / Supervisor: Other
|
Logged Email: klambert@lbl.gov
|
Division: Other
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Rick Bloemhard
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: FE0, FE1, F1, F2
|
System Information Review: Single Line Drawing, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
LOTO the modulator. Remove old thermostat. Install new thermostat. Remove LOTO. Test new thermostat |
Control of Work Area
Minimum Approach Boundary: 60
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 60 inches
|
Restricted Approach Boundary: 2 feet, 2 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 2.18, 3.37 cal/cm2
|
Arc Flash Boundary: 32 inches
|
Working Distance: 24 inches
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: 25kV
|
Capacitor total stored energy (joules): 3.125 kJ
|
Discharge wait time (minutes): >26
|
Emergency Response Plan
Nearest Landline Location: On transformer pad, switchgear room, modulator room, control room
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: B88 lobby
|
Fire Extinguisher Location: transformer pad, switchgear room (door), modulator room (door), outside control room
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
none |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |