Time / Date: 3/15/2024 11:42:01
|
JSP ID: 2319
|
Scope of Work: Glove Box unit non-operational.
|
|
Work Order: n/a
|
Building: Bldg. 70/Room 108
|
Person in Charge: Felipe Sanchez
|
Lead / Supervisor: Other
|
Logged Email: fbsanchez@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: n/a
|
|
List Other Participants: n/a
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: n/a
|
System Information Review: Single Line Drawing
|
|
Control of Hazardous Energy: Exclusive Control of Plug
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Glove box unit was out of service, no display on the monitor module. I checked voltage at the other main outlet, Voltage = 126.2 Vac. Checking on the main input line, fuse of 15amps was busted. Replaced the broken fuse. Now, I did have voltage values coming out from the outlets of the cabinet. We found the the motor pump broke down, I advised user to use the spare motor pump. Finally, the glove box unit came back up. |
Control of Work Area
Minimum Approach Boundary: n/a
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: None
|
Restricted Approach Boundary: None
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: n/a cal/cm2
|
Arc Flash Boundary: n/a
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage: n/a
|
Capacitor total stored energy (joules): n/a
|
Discharge wait time (minutes): n/a
|
Emergency Response Plan
Nearest Landline Location: inside the room
|
Emergency Number to Call: (510) 486-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: n/a
|
Fire Extinguisher Location: inside the room
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
n/a |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: