Time / Date: 3/27/2024 7:06:46
|
JSP ID: 2369
|
Scope of Work: support contractor spraying weed killer
|
|
Work Order: W0373266
|
Building: 36
|
Person in Charge: Avery Turner
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: avery.turner08@gmail.com
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: none
|
|
List Other Participants: weed removal contractors
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: none
|
System Information Review:
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Hold a tailgate meeting to in form the contractors on our safety procedures. |
Control of Work Area
Minimum Approach Boundary: 120 inches
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: spraying weeds
|
Limited Approach Boundary: 10 feet
|
Restricted Approach Boundary: 10 feet
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: none cal/cm2
|
Arc Flash Boundary: none
|
Working Distance: 10 feet
|
Arc Flash PPE Level: 2+
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage: none
|
Capacitor total stored energy (joules): none
|
Discharge wait time (minutes): none
|
Emergency Response Plan
Nearest Landline Location: building 36
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location:
|
Fire Extinguisher Location: yes in building 36
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
none |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments, |
Notes / Other
none
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |