Time / Date: 4/12/2024 10:06:23
|
JSP ID: 2445
|
Scope of Work: Close 3 120V 20A circuit breakers and verify circuit and voltage.
|
|
Work Order: 359777
|
Building: 6
|
Person in Charge: RobertRalph
|
Lead / Supervisor: Combs, Everett
|
Logged Email: robertralph@lbl.gov
|
Division: ALS
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Everett Combs
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 331A28A
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1.) fill out JSP 2.)put on correct PPE 3. Verify area is safe to energize affected circuits.4.)Remove LOTO lock. 5.) Close circuit breakers. 6. Verify voltage and circuit are correct. |
Control of Work Area
Minimum Approach Boundary: 18”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.2 cal/cm2
|
Arc Flash Boundary: 18”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Lobby B6
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Lobby B6
|
Fire Extinguisher Location: On wall 10’ from panel
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No issues no mitigation needed |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |