Time / Date: 4/15/2024 8:05:47
JSP ID: 2448
Scope of Work: 1.) Fill out JSP 2.) put on appropriate PPE 3.) Open 3 40 A 3 pole 480v circuit breakers and establish LOTO on breakers@panel 301A2A3A.4.) perform ZVV @ VFD SEO 211, SEO 212, SEO213.5.) After ZVV begin installation of conduit for communication cable.6.) after installation of race way and cable verify we can release LOTO and close circuit breakers.
Work Order: 374191
Building: B6
Person in Charge: Robert Ralph
Lead / Supervisor: Combs, Everett
Logged Email: RobertRalph@lbl.gov
Division: ALS
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Dave Davis
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 301A2A3A
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

1.) PPE 2.) open circuit breaker,3.)establish LOTO apply lock. 3.) Perform ZVV 4. Install race way and cable4.) once installation is complete remove Lock 5.) release LOTO and restore power.

Control of Work Area

Minimum Approach Boundary: 42”
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 0.6 cal/cm2
Arc Flash Boundary: 11”
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: In the storage ring
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Lobby B6
Fire Extinguisher Location: Right by door 2
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Went over all precursors everything is good.

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov