Time / Date: 4/26/2024 7:37:43
JSP ID: 2505
Scope of Work: Utilize boom lift to gain access to crane over head control box and take voltage readings for troubleshooting purposes.
Work Order: 374570
Building: 77ATake voltage readings at large ever head crane control box for Kone contractor building 077A.
Person in Charge: Alejandro Lopez
Lead / Supervisor: Ramer, Robert
Logged Email: Alopez2@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Standby Person
Second Person Identified: Steve Sechack
List Other Participants: Kone crane
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 72D
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish.

PPE, use boom lift to gain access to over head crane control box and take voltage readings.

Control of Work Area

Minimum Approach Boundary: 18 inches
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 13.8 cal/cm2
Arc Flash Boundary: 60 inches
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage: N/a
Capacitor total stored energy (joules): N/a
Discharge wait time (minutes): N/a

Emergency Response Plan

Nearest Landline Location: Located in the same room.
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: In vehicle
Fire Extinguisher Location: Located in the same room.
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov