Time / Date: 5/29/2024 10:08:14
|
JSP ID: 2623
|
Scope of Work: Perform LOTO and ZVV to replace broken circuit breaker.
|
|
Work Order: Complex LOTO Procedure # 299
|
Building: Bldg. 2/Room 137
|
Person in Charge: Felipe Sanchez
|
Lead / Supervisor: Other
|
Logged Email: fbsanchez@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: n/a
|
|
List Other Participants: n/a
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: Panel 243A/Circuit 10
|
System Information Review:
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Equipment was shutdown by customer. Main switch was provided with LOTO, ZVV was checked behind main equipment (124Vac). Defective broken circuit breaker was replaced with a new unit. LOTO was removed from main cut-off switch. Unit was powered up by customer. |
Control of Work Area
Minimum Approach Boundary: 12
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 1
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.2 cal/cm2
|
Arc Flash Boundary: 1.2
|
Working Distance: 36 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 1
|
Capacitor Hazards
Capacitor Bus Voltage: n/a
|
Capacitor total stored energy (joules): n/a
|
Discharge wait time (minutes): n/a
|
Emergency Response Plan
Nearest Landline Location: Located inside room
|
Emergency Number to Call: (510) 486-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: AED is located outside of main door.
|
Fire Extinguisher Location: Located outside of main door.
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting, Insufficient/cramped/awkward space |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
yes |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
n/a
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |