Time / Date: 5/31/2024 12:02:58
JSP ID: 2637
Scope of Work: Facility Electricians to rough in conduits and chases for Eaton Cell Watch Battery Monitoring System in B59 Eaton 9395 UPS System. Also install IBMU cabinet on wall and install TCU cans on top of UPS battery cabinets
Work Order: WO350539
Building: 59
Person in Charge: Ernie Jew
Lead / Supervisor: Grounds, Jeff
Logged Email: jtgrounds@lbl.gov
Division: Comp Sci
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Safety Watch
Second Person Identified: Ernie Jew
List Other Participants: Eaton
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: UE599A
System Information Review: Single Line Drawing, Arc Flash Labels
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Power Down B59 UPS System and LOTO (system will be in bypass) Disconnect battery strings in 6 battery cabinets to under 100VDC Install 600V sheeting over battery terminals to eliminate possible inadvertent contact Facility electricians to rough in conduits for Eaton Cell Watch system Remove 600V sheeting Reconnect battery strings Remove LOTO and power up UPS system

Control of Work Area

Minimum Approach Boundary: 96"
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 19 cal/cm2 cal/cm2
Arc Flash Boundary: 96"
Working Distance: 18 inches
Arc Flash PPE Level: 3
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Jeff Grounds Mech Level Trailer
Emergency Number to Call: 6999
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Jeff Grounds Mech Level Trailer
Fire Extinguisher Location: UPS Room at double door exit
Contact release method available and tested: Rescue hook, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands: Critical steps or irreversible acts
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Follow MOP carefully and use two person verification of steps

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov