Time / Date: 6/5/2024 13:17:30
|
JSP ID: 2649
|
Scope of Work: Replace defective air valve and power cord on autoclave unit.
|
|
Work Order: n/a
|
Building: Bldg. 70A, Rm. 4463
|
Person in Charge: Felipe Sanchez
|
Lead / Supervisor: Other
|
Logged Email: fbsanchez@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: n/a
|
|
List Other Participants: n/a
|
|
Affected Persons Notified: N/A
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: n/a
|
System Information Review: n/a
|
|
Control of Hazardous Energy: Cord & Plug LOTO
|
|
Equipment Condition: Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Autoclave unit had been non-operational for months now. Checked voltage (122.2Vac). Contractor replaced defective power cord and plug. Replaced broken valve and found solid residue inside. Cleaned with tap water. Checked also the rest of the copper tubings with the same solid residue inside. Powered unit for calibration. Unit was operational and turned over to customer/user. |
Control of Work Area
Minimum Approach Boundary: n/a
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: None
|
Restricted Approach Boundary: None
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: n/a cal/cm2
|
Arc Flash Boundary: n/a
|
Working Distance: 36 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: n/a
|
Capacitor total stored energy (joules): n/a
|
Discharge wait time (minutes): n/a
|
Emergency Response Plan
Nearest Landline Location: inside room
|
Emergency Number to Call: (510) 486-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: inside room
|
Fire Extinguisher Location: inside room
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
n/a |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
n/a
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |